Car Park Ventilation CFD
Performance-Based Car Park Ventilation Solutions
CFD analysis and performance-based design for enclosed and naturally ventilated car parks to optimise airflow, improve pollutant removal and demonstrate compliance with NCC and AS 1668 requirements.
Deratec helps developers, architects and mechanical consultants achieve practical and cost-effective car park ventilation solutions through advanced airflow simulation and performance-based assessments. Our studies can reduce ductwork, fan capacity and energy consumption while maintaining compliance and occupant safety.
Services
-
Car Park Ventilation CFD Analysis
-
Jet Fan Optimisation
-
Airflow Distribution Assessment
-
CO Concentration Analysis
-
Natural Ventilation Assessment
-
Smoke Clearance Assessment
-
Performance Solution Development
-
Existing Car Park Reviews
-
Ventilation System Optimisation
Typical Applications
-
Residential Developments
-
Commercial Buildings
-
Mixed-Use Developments
-
Retail Centres
-
Existing Car Park Upgrades
-
Basement Car Parks
-
Naturally Ventilated Car Parks
Standards & Compliance
Our assessments are undertaken in accordance with relevant Australian standards and NCC requirements, including:
-
AS 1668.2
-
NCC 2022 Performance Requirements
-
NCC Performance Solutions
-
Local Authority Requirements
Deliverables
-
Professional CFD Report
-
Compliance Assessment
-
Airflow Visualisations
-
CO Distribution Results
-
Jet Fan Layout Recommendations
-
Ventilation System Optimisation Recommendations
-
Performance Solution Documentation
Why Choose Deratec?
-
Extensive experience in car park ventilation CFD
-
Practical and buildable solutions
-
Optimised jet fan and duct layouts
-
Potential reduction in fan power and installation costs
-
Strong understanding of NCC and AS1668 requirements
-
Australia-wide project experience
Improve Performance and Reduce Costs
Whether you are designing a new development or reviewing an existing car park, Deratec can provide practical CFD-based solutions to improve performance, support compliance and optimise construction costs.
Get in Touch
Ready to discuss your project compliance challenge?
Contact us today for a free consultation or quote.
We'll review your requirements and recommend the best sustainable solution for your project.

Car Park CO Distrbution in a 1.6 m Above the Floor, Modelled with CFD

CO Distrbution in a Car Park, 3D Modelled with CFD
